Gantt chart

The shooting schedule as bars across shoot days: one row per location, day and night work told apart, company moves marked where the unit packs up mid-day, days off hatched.

ComponentsData visualisationReady for Kwark

Shooting schedule · Blank Pages

12 shoot days over two weeks, 5 locations, 2 company moves. Today is Day 4.

Location
Day 1Mon 18
Day 2Tue 19
Day 3Wed 20
Day 4Thu 21
Day 5Fri 22
Day 6Sat 23
OffSun 24
Day 7Mon 25
Day 8Tue 26
Day 9Wed 27
Day 10Thu 28
Day 11Fri 29
Day 12Sat 30
OffSun 1
Lumen Studios, Stage 2INT. EDIT SUITE
Andheri East, Lane 4EXT. STREET
Old Film Lab rooftopEXT. ROOF
Mira's flat, VersovaINT. FLAT
Highway, GoregaonEXT. HIGHWAY – DAWN
Company movesduring a shoot day
35 min
50 min
Shooting schedule, Blank Pages, 18 November to 1 December
DayDateLocationScenesLightCompany move
Day 1Mon 18Lumen Studios, Stage 2Sc 12, 14, 15Day
Day 2Tue 19Lumen Studios, Stage 2Sc 12, 14, 15Day
Day 3Wed 20Lumen Studios, Stage 2Sc 12, 14, 15Day
Day 4Thu 21Lumen Studios, Stage 2, morning; then Andheri East, Lane 4, afternoonSc 12, 14, 15; Sc 3, 9DayLumen Studios to Andheri East, about 35 min
Day 5Fri 22Andheri East, Lane 4Sc 3, 9Day
Day 6Sat 23Old Film Lab rooftopSc 13Night
OffSun 24Day off
Day 7Mon 25Old Film Lab rooftopSc 22Night
Day 8Tue 26Mira's flat, VersovaSc 2, 5, 18Day
Day 9Wed 27Mira's flat, VersovaSc 2, 5, 18Day
Day 10Thu 28Lumen Studios, Stage 2, afternoon; then Mira's flat, Versova, morningSc 31, 40; Sc 2, 5, 18DayMira's flat to Lumen Studios, about 50 min
Day 11Fri 29Lumen Studios, Stage 2Sc 31, 40Day
Day 12Sat 30Highway, GoregaonSc 1Day
OffSun 1Day off

Shooting schedule · Blank Pages

12 shoot days over two weeks, 5 locations, 2 company moves. Today is Day 4.

Location
Day 1Mon 18
Day 2Tue 19
Day 3Wed 20
Day 4Thu 21
Day 5Fri 22
Day 6Sat 23
OffSun 24
Day 7Mon 25
Day 8Tue 26
Day 9Wed 27
Day 10Thu 28
Day 11Fri 29
Day 12Sat 30
OffSun 1
Lumen Studios, Stage 2INT. EDIT SUITE
Andheri East, Lane 4EXT. STREET
Old Film Lab rooftopEXT. ROOF
Mira's flat, VersovaINT. FLAT
Highway, GoregaonEXT. HIGHWAY – DAWN
Company movesduring a shoot day
35 min
50 min
Shooting schedule, Blank Pages, 18 November to 1 December
DayDateLocationScenesLightCompany move
Day 1Mon 18Lumen Studios, Stage 2Sc 12, 14, 15Day
Day 2Tue 19Lumen Studios, Stage 2Sc 12, 14, 15Day
Day 3Wed 20Lumen Studios, Stage 2Sc 12, 14, 15Day
Day 4Thu 21Lumen Studios, Stage 2, morning; then Andheri East, Lane 4, afternoonSc 12, 14, 15; Sc 3, 9DayLumen Studios to Andheri East, about 35 min
Day 5Fri 22Andheri East, Lane 4Sc 3, 9Day
Day 6Sat 23Old Film Lab rooftopSc 13Night
OffSun 24Day off
Day 7Mon 25Old Film Lab rooftopSc 22Night
Day 8Tue 26Mira's flat, VersovaSc 2, 5, 18Day
Day 9Wed 27Mira's flat, VersovaSc 2, 5, 18Day
Day 10Thu 28Lumen Studios, Stage 2, afternoon; then Mira's flat, Versova, morningSc 31, 40; Sc 2, 5, 18DayMira's flat to Lumen Studios, about 50 min
Day 11Fri 29Lumen Studios, Stage 2Sc 31, 40Day
Day 12Sat 30Highway, GoregaonSc 1Day
OffSun 1Day off
<figure class="kw-viz kw-viz--wide">
  <figcaption class="kw-viz__head"><div><p class="kw-viz__title">Shooting schedule · Blank Pages</p><p class="kw-viz__reading">12 shoot days over two weeks, 5 locations, 2 company moves. Today is Day 4.</p></div><label class="kw-viz__switch"><input class="kw-visually-hidden" type="checkbox" role="switch" aria-label="Show the shooting schedule as a table"><svg viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="1.75" stroke-linecap="round" stroke-linejoin="round" aria-hidden="true"><rect x="3" y="4" width="18" height="16" rx="2"/><path d="M3 10h18M3 15h18M9 10v10"/></svg><span>Table</span></label></figcaption>
  <div class="kw-viz__plot">
    <div class="kw-sched" tabindex="0" role="group" aria-label="Shooting schedule, scrolls sideways">
      <div class="kw-sched__grid" style="--kw-halves:28"><div class="kw-sched__corner" style="grid-row:1;grid-column:1">Location</div><div class="kw-sched__day" style="grid-row:1;grid-column:2 / span 2"><b>Day 1</b><span>Mon 18</span></div><div class="kw-sched__col" style="grid-row:2 / span 6;grid-column:2 / span 2" aria-hidden="true"></div><div class="kw-sched__day" style="grid-row:1;grid-column:4 / span 2"><b>Day 2</b><span>Tue 19</span></div><div class="kw-sched__col" style="grid-row:2 / span 6;grid-column:4 / span 2" aria-hidden="true"></div><div class="kw-sched__day" style="grid-row:1;grid-column:6 / span 2"><b>Day 3</b><span>Wed 20</span></div><div class="kw-sched__col" style="grid-row:2 / span 6;grid-column:6 / span 2" aria-hidden="true"></div><div class="kw-sched__day is-today" style="grid-row:1;grid-column:8 / span 2"><b>Day 4</b><span>Thu 21</span></div><div class="kw-sched__col" style="grid-row:2 / span 6;grid-column:8 / span 2" aria-hidden="true"></div><div class="kw-sched__day" style="grid-row:1;grid-column:10 / span 2"><b>Day 5</b><span>Fri 22</span></div><div class="kw-sched__col" style="grid-row:2 / span 6;grid-column:10 / span 2" aria-hidden="true"></div><div class="kw-sched__day" style="grid-row:1;grid-column:12 / span 2"><b>Day 6</b><span>Sat 23</span></div><div class="kw-sched__col" style="grid-row:2 / span 6;grid-column:12 / span 2" aria-hidden="true"></div><div class="kw-sched__day is-off" style="grid-row:1;grid-column:14 / span 2"><b>Off</b><span>Sun 24</span></div><div class="kw-sched__col is-off" style="grid-row:2 / span 6;grid-column:14 / span 2" aria-hidden="true"></div><div class="kw-sched__day" style="grid-row:1;grid-column:16 / span 2"><b>Day 7</b><span>Mon 25</span></div><div class="kw-sched__col" style="grid-row:2 / span 6;grid-column:16 / span 2" aria-hidden="true"></div><div class="kw-sched__day" style="grid-row:1;grid-column:18 / span 2"><b>Day 8</b><span>Tue 26</span></div><div class="kw-sched__col" style="grid-row:2 / span 6;grid-column:18 / span 2" aria-hidden="true"></div><div class="kw-sched__day" style="grid-row:1;grid-column:20 / span 2"><b>Day 9</b><span>Wed 27</span></div><div class="kw-sched__col" style="grid-row:2 / span 6;grid-column:20 / span 2" aria-hidden="true"></div><div class="kw-sched__day" style="grid-row:1;grid-column:22 / span 2"><b>Day 10</b><span>Thu 28</span></div><div class="kw-sched__col" style="grid-row:2 / span 6;grid-column:22 / span 2" aria-hidden="true"></div><div class="kw-sched__day" style="grid-row:1;grid-column:24 / span 2"><b>Day 11</b><span>Fri 29</span></div><div class="kw-sched__col" style="grid-row:2 / span 6;grid-column:24 / span 2" aria-hidden="true"></div><div class="kw-sched__day" style="grid-row:1;grid-column:26 / span 2"><b>Day 12</b><span>Sat 30</span></div><div class="kw-sched__col" style="grid-row:2 / span 6;grid-column:26 / span 2" aria-hidden="true"></div><div class="kw-sched__day is-off" style="grid-row:1;grid-column:28 / span 2"><b>Off</b><span>Sun 1</span></div><div class="kw-sched__col is-off" style="grid-row:2 / span 6;grid-column:28 / span 2" aria-hidden="true"></div><div class="kw-sched__place" style="grid-row:2;grid-column:1"><strong>Lumen Studios, Stage 2</strong><small>INT. EDIT SUITE</small></div><button type="button" class="kw-sched__bar" style="grid-row:2;grid-column:2 / span 7" data-light="day" aria-label="Lumen Studios, Stage 2, Day 1 to Day 4 morning, scenes 12, 14, 15, day work"><span>Sc 12, 14, 15</span></button><button type="button" class="kw-sched__bar" style="grid-row:2;grid-column:23 / span 3" data-light="day" aria-label="Lumen Studios, Stage 2, Day 10 afternoon to Day 11, scenes 31, 40, day work"><span>Sc 31, 40</span></button><div class="kw-sched__place" style="grid-row:3;grid-column:1"><strong>Andheri East, Lane 4</strong><small>EXT. STREET</small></div><button type="button" class="kw-sched__bar" style="grid-row:3;grid-column:9 / span 3" data-light="day" aria-label="Andheri East, Lane 4, Day 4 afternoon to Day 5, scenes 3, 9, day work"><span>Sc 3, 9</span></button><div class="kw-sched__place" style="grid-row:4;grid-column:1"><strong>Old Film Lab rooftop</strong><small>EXT. ROOF</small></div><button type="button" class="kw-sched__bar" style="grid-row:4;grid-column:12 / span 2" data-light="night" aria-label="Old Film Lab rooftop, Day 6, scenes 13, night work"><span>Sc 13</span></button><button type="button" class="kw-sched__bar" style="grid-row:4;grid-column:16 / span 2" data-light="night" aria-label="Old Film Lab rooftop, Day 7, scenes 22, night work"><span>Sc 22</span></button><div class="kw-sched__place" style="grid-row:5;grid-column:1"><strong>Mira's flat, Versova</strong><small>INT. FLAT</small></div><button type="button" class="kw-sched__bar" style="grid-row:5;grid-column:18 / span 5" data-light="day" aria-label="Mira's flat, Versova, Day 8 to Day 10 morning, scenes 2, 5, 18, day work"><span>Sc 2, 5, 18</span></button><div class="kw-sched__place" style="grid-row:6;grid-column:1"><strong>Highway, Goregaon</strong><small>EXT. HIGHWAY – DAWN</small></div><button type="button" class="kw-sched__bar" style="grid-row:6;grid-column:26 / span 2" data-light="day" aria-label="Highway, Goregaon, Day 12, dawn, scenes 1, day work"><span>Sc 1</span></button><div class="kw-sched__place kw-sched__place--moves" style="grid-row:7;grid-column:1"><strong>Company moves</strong><small>during a shoot day</small></div><div class="kw-sched__move" style="grid-row:2 / span 6;grid-column:9 / span 1" role="note" aria-label="Company move on Day 4, Lumen Studios to Andheri East, about 35 min"><span><svg viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="1.75" stroke-linecap="round" stroke-linejoin="round" aria-hidden="true"><path d="M3 7h11v9H3zM14 10h4l3 3v3h-7"/><circle cx="7" cy="17.5" r="1.5"/><circle cx="17" cy="17.5" r="1.5"/></svg>35 min</span></div><div class="kw-sched__move" style="grid-row:2 / span 6;grid-column:23 / span 1" role="note" aria-label="Company move on Day 10, Mira's flat to Lumen Studios, about 50 min"><span><svg viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="1.75" stroke-linecap="round" stroke-linejoin="round" aria-hidden="true"><path d="M3 7h11v9H3zM14 10h4l3 3v3h-7"/><circle cx="7" cy="17.5" r="1.5"/><circle cx="17" cy="17.5" r="1.5"/></svg>50 min</span></div><div class="kw-sched__today" style="grid-row:1 / span 7;grid-column:8 / span 1" aria-hidden="true"></div></div>
    </div>
    <p class="kw-viz__foot" aria-hidden="true"><span class="kw-viz__key" style="--kw-key:var(--k-chart-mango)">Day work</span><span class="kw-viz__key" style="--kw-key:var(--k-chart-aqua)">Night work</span><span class="kw-viz__key kw-viz__key--dash" style="--kw-key:var(--k-chart-coral)">Company move</span><span class="kw-viz__key kw-viz__key--hatch">Day off</span></p>
  </div>
  <div class="kw-viz__table"><table><caption>Shooting schedule, Blank Pages, 18 November to 1 December</caption><thead><tr><th scope="col">Day</th><th scope="col">Date</th><th scope="col">Location</th><th scope="col">Scenes</th><th scope="col">Light</th><th scope="col">Company move</th></tr></thead><tbody><tr><th scope="row">Day 1</th><td>Mon 18</td><td>Lumen Studios, Stage 2</td><td>Sc 12, 14, 15</td><td>Day</td><td></td></tr><tr><th scope="row">Day 2</th><td>Tue 19</td><td>Lumen Studios, Stage 2</td><td>Sc 12, 14, 15</td><td>Day</td><td></td></tr><tr><th scope="row">Day 3</th><td>Wed 20</td><td>Lumen Studios, Stage 2</td><td>Sc 12, 14, 15</td><td>Day</td><td></td></tr><tr><th scope="row">Day 4</th><td>Thu 21</td><td>Lumen Studios, Stage 2, morning; then Andheri East, Lane 4, afternoon</td><td>Sc 12, 14, 15; Sc 3, 9</td><td>Day</td><td>Lumen Studios to Andheri East, about 35 min</td></tr><tr><th scope="row">Day 5</th><td>Fri 22</td><td>Andheri East, Lane 4</td><td>Sc 3, 9</td><td>Day</td><td></td></tr><tr><th scope="row">Day 6</th><td>Sat 23</td><td>Old Film Lab rooftop</td><td>Sc 13</td><td>Night</td><td></td></tr><tr><th scope="row">Off</th><td>Sun 24</td><td>Day off</td><td></td><td></td><td></td></tr><tr><th scope="row">Day 7</th><td>Mon 25</td><td>Old Film Lab rooftop</td><td>Sc 22</td><td>Night</td><td></td></tr><tr><th scope="row">Day 8</th><td>Tue 26</td><td>Mira's flat, Versova</td><td>Sc 2, 5, 18</td><td>Day</td><td></td></tr><tr><th scope="row">Day 9</th><td>Wed 27</td><td>Mira's flat, Versova</td><td>Sc 2, 5, 18</td><td>Day</td><td></td></tr><tr><th scope="row">Day 10</th><td>Thu 28</td><td>Lumen Studios, Stage 2, afternoon; then Mira's flat, Versova, morning</td><td>Sc 31, 40; Sc 2, 5, 18</td><td>Day</td><td>Mira's flat to Lumen Studios, about 50 min</td></tr><tr><th scope="row">Day 11</th><td>Fri 29</td><td>Lumen Studios, Stage 2</td><td>Sc 31, 40</td><td>Day</td><td></td></tr><tr><th scope="row">Day 12</th><td>Sat 30</td><td>Highway, Goregaon</td><td>Sc 1</td><td>Day</td><td></td></tr><tr><th scope="row">Off</th><td>Sun 1</td><td>Day off</td><td></td><td></td><td></td></tr></tbody></table></div>
</figure>

What it is

A Gantt chart draws work that lasts across days as bars against a calendar. In Kwark it is the shooting schedule seen from above: the stripboard tells a 1st AD the order of scenes inside a day, the Gantt tells the producer and the location manager where the unit is on which day, and when it moves.

The specimen is two weeks of Blank Pages: 12 shoot days, five locations, two Sundays off, and two company moves, the moments the whole unit packs up and drives to the next location during a shoot day. A move costs the day 35 to 50 minutes of shooting, so it is the thing a schedule is most often re-cut to avoid. A generic Gantt has no place for it. This one gives it a row.

When to use

  • The schedule overview: shoot days per location, split days, night work, days off.
  • Prep and post plans where overlap matters: recce, rehearsal, build, wrap-out.
  • Any plan where a bar is a stretch of days and a gap means something (a day off, a turnaround).

When not to

  • For the order of scenes within a day. Use the Stripboard strip.
  • For a film’s phases from first draft to release. Use the Production timeline.
  • For hours inside one day (crew call to wrap). Use the Production calendar week view.
  • For task tracking with owners and dependencies. Kwark is not a task tracker; dependencies go in words in the table.

Anatomy in use

  • Header: one column per calendar day, Day 4 above Thu 21. Shoot days are numbered the way the call sheet numbers them; days off say Off and do not take a number.
  • Rows: one per location, named the way the location list names it (Lumen Studios, Stage 2), with the set from the script under it (INT. EDIT SUITE).
  • Bars: a block of work at that location, labelled with its scenes. Each day is two halves, so a split day reads exactly.
  • Light: day work is mango, night work is aqua. The words night and dawn are in the bar’s name and in the table, never colour alone.
  • Company moves: a dashed coral rule through every row at the moment of the move, with a van and the drive time at the foot.
  • Today: a 2px rule in the text colour, labelled in the header. Not red: being on Day 4 is not an alarm.

Writing

  • The reading line says the schedule in one sentence: 12 shoot days over two weeks, 5 locations, 2 company moves. Today is Day 4.
  • Bars name scenes (Sc 12, 14, 15); the table carries the full location, scene list and light.
  • A move is a fact with its time: 35 min. Never Inefficient or a warning colour.

Five location rows, scenes on the bars, two company moves with their drive times, days off hatched and unnumbered.

Do

One bar per scene in a rainbow of colours, the today line in red, and Sundays numbered as shoot days.

Don’t

Rooftop · Sc 13 · night in aqua with the word night in its name.

Do

Night work told apart only by a darker colour.

Don’t

Anatomy

  1. Frame: the chart card (.kw-viz), 1px --k-line, 10px corners, 16px × 24px padding.
  2. Head: title 14px 600, the reading in 12px --k-text-2, the Table switch on the right.
  3. Grid (.kw-sched__grid): a 168px sticky location column, then two columns per calendar day, each at least 20px. The body scrolls sideways inside the card; the location column stays.
  4. Day header: 56px (the top 20px holds the Today tag), Day n 12px 600 over the date in 12px --k-text-2. Today’s header takes --k-raise.
  5. Row: 40px, 1px --k-line between days.
  6. Bar: 28px tall, 6px corners, 3px left edge in the light colour, fill at 22% of it on the surface, label 12px 500 --k-text, truncated with an ellipsis.
  7. Company move: 0 width, 2px dashed coral down every row, a 22px pill at the foot with a 14px van and the minutes.
  8. Day off: a 135° hatch at 6% of the text colour.
  9. Today: 2px --k-text rule from header to foot.

Tokens

Token Light Dark
--k-chart-mango #b4802e var(–k-brand-mango)
--k-chart-aqua #509ca0 var(–k-brand-aqua)
--k-chart-coral #bf5d45 var(–k-brand-coral)
--k-surface #ffffff #1a1a1a
--k-raise #f1f5f9 #252525
--k-line #e2e8f0 rgba(255, 255, 255, .1)
--k-text #0f172a #e3e3e3
--k-text-2 #5b6779 #9ca3af
--k-radius-card 10px
--k-radius-control 6px
--k-fs-meta 12px

Colour

Mark Token Why
Day work --k-chart-mango Palette No. 300 mango, 25% lower in lightness for light rooms
Night work --k-chart-aqua Aqua, the cool partner of mango
Company move --k-chart-coral Coral, used only for the move so it is never mistaken for work
Today --k-text A position, not a state

States

State Look
Rest Fill 22%, 3px edge
Hover Fill 34%
Focus 2px --k-focus outline drawn inside the bar, so it is never clipped by the row
Selected (aria-pressed="true") Fill 34% and a 1px border all round in the light colour
Split day A bar that starts or ends on a half column

React

Use the HTML below with kwark.css. The example shows the markup and styling. Supply any application behavior described on this page.

HTML and CSS

Works anywhere with kwark.css.

<figure class="kw-viz kw-viz--wide">
  <figcaption class="kw-viz__head"><div><p class="kw-viz__title">Shooting schedule · Blank Pages</p><p class="kw-viz__reading">12 shoot days over two weeks, 5 locations, 2 company moves. Today is Day 4.</p></div><label class="kw-viz__switch"><input class="kw-visually-hidden" type="checkbox" role="switch" aria-label="Show the shooting schedule as a table"><svg viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="1.75" stroke-linecap="round" stroke-linejoin="round" aria-hidden="true"><rect x="3" y="4" width="18" height="16" rx="2"/><path d="M3 10h18M3 15h18M9 10v10"/></svg><span>Table</span></label></figcaption>
  <div class="kw-viz__plot">
    <div class="kw-sched" tabindex="0" role="group" aria-label="Shooting schedule, scrolls sideways">
      <div class="kw-sched__grid" style="--kw-halves:28"><div class="kw-sched__corner" style="grid-row:1;grid-column:1">Location</div><div class="kw-sched__day" style="grid-row:1;grid-column:2 / span 2"><b>Day 1</b><span>Mon 18</span></div><div class="kw-sched__col" style="grid-row:2 / span 6;grid-column:2 / span 2" aria-hidden="true"></div><div class="kw-sched__day" style="grid-row:1;grid-column:4 / span 2"><b>Day 2</b><span>Tue 19</span></div><div class="kw-sched__col" style="grid-row:2 / span 6;grid-column:4 / span 2" aria-hidden="true"></div><div class="kw-sched__day" style="grid-row:1;grid-column:6 / span 2"><b>Day 3</b><span>Wed 20</span></div><div class="kw-sched__col" style="grid-row:2 / span 6;grid-column:6 / span 2" aria-hidden="true"></div><div class="kw-sched__day is-today" style="grid-row:1;grid-column:8 / span 2"><b>Day 4</b><span>Thu 21</span></div><div class="kw-sched__col" style="grid-row:2 / span 6;grid-column:8 / span 2" aria-hidden="true"></div><div class="kw-sched__day" style="grid-row:1;grid-column:10 / span 2"><b>Day 5</b><span>Fri 22</span></div><div class="kw-sched__col" style="grid-row:2 / span 6;grid-column:10 / span 2" aria-hidden="true"></div><div class="kw-sched__day" style="grid-row:1;grid-column:12 / span 2"><b>Day 6</b><span>Sat 23</span></div><div class="kw-sched__col" style="grid-row:2 / span 6;grid-column:12 / span 2" aria-hidden="true"></div><div class="kw-sched__day is-off" style="grid-row:1;grid-column:14 / span 2"><b>Off</b><span>Sun 24</span></div><div class="kw-sched__col is-off" style="grid-row:2 / span 6;grid-column:14 / span 2" aria-hidden="true"></div><div class="kw-sched__day" style="grid-row:1;grid-column:16 / span 2"><b>Day 7</b><span>Mon 25</span></div><div class="kw-sched__col" style="grid-row:2 / span 6;grid-column:16 / span 2" aria-hidden="true"></div><div class="kw-sched__day" style="grid-row:1;grid-column:18 / span 2"><b>Day 8</b><span>Tue 26</span></div><div class="kw-sched__col" style="grid-row:2 / span 6;grid-column:18 / span 2" aria-hidden="true"></div><div class="kw-sched__day" style="grid-row:1;grid-column:20 / span 2"><b>Day 9</b><span>Wed 27</span></div><div class="kw-sched__col" style="grid-row:2 / span 6;grid-column:20 / span 2" aria-hidden="true"></div><div class="kw-sched__day" style="grid-row:1;grid-column:22 / span 2"><b>Day 10</b><span>Thu 28</span></div><div class="kw-sched__col" style="grid-row:2 / span 6;grid-column:22 / span 2" aria-hidden="true"></div><div class="kw-sched__day" style="grid-row:1;grid-column:24 / span 2"><b>Day 11</b><span>Fri 29</span></div><div class="kw-sched__col" style="grid-row:2 / span 6;grid-column:24 / span 2" aria-hidden="true"></div><div class="kw-sched__day" style="grid-row:1;grid-column:26 / span 2"><b>Day 12</b><span>Sat 30</span></div><div class="kw-sched__col" style="grid-row:2 / span 6;grid-column:26 / span 2" aria-hidden="true"></div><div class="kw-sched__day is-off" style="grid-row:1;grid-column:28 / span 2"><b>Off</b><span>Sun 1</span></div><div class="kw-sched__col is-off" style="grid-row:2 / span 6;grid-column:28 / span 2" aria-hidden="true"></div><div class="kw-sched__place" style="grid-row:2;grid-column:1"><strong>Lumen Studios, Stage 2</strong><small>INT. EDIT SUITE</small></div><button type="button" class="kw-sched__bar" style="grid-row:2;grid-column:2 / span 7" data-light="day" aria-label="Lumen Studios, Stage 2, Day 1 to Day 4 morning, scenes 12, 14, 15, day work"><span>Sc 12, 14, 15</span></button><button type="button" class="kw-sched__bar" style="grid-row:2;grid-column:23 / span 3" data-light="day" aria-label="Lumen Studios, Stage 2, Day 10 afternoon to Day 11, scenes 31, 40, day work"><span>Sc 31, 40</span></button><div class="kw-sched__place" style="grid-row:3;grid-column:1"><strong>Andheri East, Lane 4</strong><small>EXT. STREET</small></div><button type="button" class="kw-sched__bar" style="grid-row:3;grid-column:9 / span 3" data-light="day" aria-label="Andheri East, Lane 4, Day 4 afternoon to Day 5, scenes 3, 9, day work"><span>Sc 3, 9</span></button><div class="kw-sched__place" style="grid-row:4;grid-column:1"><strong>Old Film Lab rooftop</strong><small>EXT. ROOF</small></div><button type="button" class="kw-sched__bar" style="grid-row:4;grid-column:12 / span 2" data-light="night" aria-label="Old Film Lab rooftop, Day 6, scenes 13, night work"><span>Sc 13</span></button><button type="button" class="kw-sched__bar" style="grid-row:4;grid-column:16 / span 2" data-light="night" aria-label="Old Film Lab rooftop, Day 7, scenes 22, night work"><span>Sc 22</span></button><div class="kw-sched__place" style="grid-row:5;grid-column:1"><strong>Mira's flat, Versova</strong><small>INT. FLAT</small></div><button type="button" class="kw-sched__bar" style="grid-row:5;grid-column:18 / span 5" data-light="day" aria-label="Mira's flat, Versova, Day 8 to Day 10 morning, scenes 2, 5, 18, day work"><span>Sc 2, 5, 18</span></button><div class="kw-sched__place" style="grid-row:6;grid-column:1"><strong>Highway, Goregaon</strong><small>EXT. HIGHWAY – DAWN</small></div><button type="button" class="kw-sched__bar" style="grid-row:6;grid-column:26 / span 2" data-light="day" aria-label="Highway, Goregaon, Day 12, dawn, scenes 1, day work"><span>Sc 1</span></button><div class="kw-sched__place kw-sched__place--moves" style="grid-row:7;grid-column:1"><strong>Company moves</strong><small>during a shoot day</small></div><div class="kw-sched__move" style="grid-row:2 / span 6;grid-column:9 / span 1" role="note" aria-label="Company move on Day 4, Lumen Studios to Andheri East, about 35 min"><span><svg viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="1.75" stroke-linecap="round" stroke-linejoin="round" aria-hidden="true"><path d="M3 7h11v9H3zM14 10h4l3 3v3h-7"/><circle cx="7" cy="17.5" r="1.5"/><circle cx="17" cy="17.5" r="1.5"/></svg>35 min</span></div><div class="kw-sched__move" style="grid-row:2 / span 6;grid-column:23 / span 1" role="note" aria-label="Company move on Day 10, Mira's flat to Lumen Studios, about 50 min"><span><svg viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="1.75" stroke-linecap="round" stroke-linejoin="round" aria-hidden="true"><path d="M3 7h11v9H3zM14 10h4l3 3v3h-7"/><circle cx="7" cy="17.5" r="1.5"/><circle cx="17" cy="17.5" r="1.5"/></svg>50 min</span></div><div class="kw-sched__today" style="grid-row:1 / span 7;grid-column:8 / span 1" aria-hidden="true"></div></div>
    </div>
    <p class="kw-viz__foot" aria-hidden="true"><span class="kw-viz__key" style="--kw-key:var(--k-chart-mango)">Day work</span><span class="kw-viz__key" style="--kw-key:var(--k-chart-aqua)">Night work</span><span class="kw-viz__key kw-viz__key--dash" style="--kw-key:var(--k-chart-coral)">Company move</span><span class="kw-viz__key kw-viz__key--hatch">Day off</span></p>
  </div>
  <div class="kw-viz__table"><table><caption>Shooting schedule, Blank Pages, 18 November to 1 December</caption><thead><tr><th scope="col">Day</th><th scope="col">Date</th><th scope="col">Location</th><th scope="col">Scenes</th><th scope="col">Light</th><th scope="col">Company move</th></tr></thead><tbody><tr><th scope="row">Day 1</th><td>Mon 18</td><td>Lumen Studios, Stage 2</td><td>Sc 12, 14, 15</td><td>Day</td><td></td></tr><tr><th scope="row">Day 2</th><td>Tue 19</td><td>Lumen Studios, Stage 2</td><td>Sc 12, 14, 15</td><td>Day</td><td></td></tr><tr><th scope="row">Day 3</th><td>Wed 20</td><td>Lumen Studios, Stage 2</td><td>Sc 12, 14, 15</td><td>Day</td><td></td></tr><tr><th scope="row">Day 4</th><td>Thu 21</td><td>Lumen Studios, Stage 2, morning; then Andheri East, Lane 4, afternoon</td><td>Sc 12, 14, 15; Sc 3, 9</td><td>Day</td><td>Lumen Studios to Andheri East, about 35 min</td></tr><tr><th scope="row">Day 5</th><td>Fri 22</td><td>Andheri East, Lane 4</td><td>Sc 3, 9</td><td>Day</td><td></td></tr><tr><th scope="row">Day 6</th><td>Sat 23</td><td>Old Film Lab rooftop</td><td>Sc 13</td><td>Night</td><td></td></tr><tr><th scope="row">Off</th><td>Sun 24</td><td>Day off</td><td></td><td></td><td></td></tr><tr><th scope="row">Day 7</th><td>Mon 25</td><td>Old Film Lab rooftop</td><td>Sc 22</td><td>Night</td><td></td></tr><tr><th scope="row">Day 8</th><td>Tue 26</td><td>Mira's flat, Versova</td><td>Sc 2, 5, 18</td><td>Day</td><td></td></tr><tr><th scope="row">Day 9</th><td>Wed 27</td><td>Mira's flat, Versova</td><td>Sc 2, 5, 18</td><td>Day</td><td></td></tr><tr><th scope="row">Day 10</th><td>Thu 28</td><td>Lumen Studios, Stage 2, afternoon; then Mira's flat, Versova, morning</td><td>Sc 31, 40; Sc 2, 5, 18</td><td>Day</td><td>Mira's flat to Lumen Studios, about 50 min</td></tr><tr><th scope="row">Day 11</th><td>Fri 29</td><td>Lumen Studios, Stage 2</td><td>Sc 31, 40</td><td>Day</td><td></td></tr><tr><th scope="row">Day 12</th><td>Sat 30</td><td>Highway, Goregaon</td><td>Sc 1</td><td>Day</td><td></td></tr><tr><th scope="row">Off</th><td>Sun 1</td><td>Day off</td><td></td><td></td><td></td></tr></tbody></table></div>
</figure>

Building it

  • Lay the chart out as one CSS grid. Set --kw-halves to twice the number of calendar days; place each bar with grid-row (its location) and grid-column: <2 + start half> / span <halves>.
  • Company moves and day-off columns span every body row (grid-row: 2 / span <rows>); the today rule spans the header too.
  • Keep the table in the same figure. The Table switch shows it in place of the chart with CSS only (:has(input:checked)); without the switch it stays visually hidden and readable by screen readers.
  • Generate the table from the same data as the bars. Never type it twice.

Keyboard

Key Does
Tab Moves to the scroll area, then through the bars in reading order (location by location)
Left and right arrows Scroll the schedule sideways when the scroll area has focus
Enter or Space on a bar Opens that block’s days in the stripboard
Space on Table Shows the schedule as a table

Screen readers

  • Each bar is a button named in full: Lumen Studios, Stage 2, Day 1 to Day 4 morning, scenes 12, 14, 15, day work.
  • Company moves are notes named with the day, route and minutes.
  • The table always holds every day, location, scene list, light and move.

Colour and touch

  • Day and night differ by words as well as colour. Moves are dashed, not only coral.
  • On a phone the location column stays and the days scroll; bars are 28px high inside 40px rows, so the whole row is the touch target when opened from the list.

Rules

  • Must number shoot days the way the call sheet does and leave days off unnumbered.
  • Must give every company move its own mark with the drive time.
  • Never tell day from night by colour alone; put the word in the bar and the table.
  • Never draw today, a split day or a move in a warning colour.
  • Always keep the table in the figure, built from the same data as the bars.
  • Must keep the location column visible while the days scroll.

AI readiness test

Task. Show the location manager where the unit is for the three weeks of the Blank Pages shoot.

Give the agent. This page, Stripboard strip, Call sheet, Data visualisation.

Constraint. Week 2 has a split day at the rooftop and a Saturday night exterior; Sundays are off.

A reliable answer

  • One row per location with its set
  • Shoot days numbered as on the call sheet, Sundays Off and unnumbered
  • The split day drawn in half columns with a company move mark and minutes
  • Night work in aqua with the word night
  • Table switch with every day