Kwark. Design System
Open Kwark

Scheduling and call sheets

Build the first AD's tools: a stripboard in pages and eighths with the four paper colours, shooting days, day out of days, and call sheets issued as numbered, frozen revisions that print, save as PDF and download as CSV.

Creative app kits
Thea Experience

Blank Pages

DirectorMira Rao1st ADSana K.
Crew call07:30Day 4 of 18Rev 3

Who it is for

Teams building scheduling and AD software, crew call apps, or the production side of a filmmaking suite. The people using it are first and second assistant directors, who build and break the schedule; production coordinators, who issue the sheets; heads of department, who read them the night before; and actors and crew, who hold the sheet on a phone at 6 a.m.

This kit is in Kwark: Schedule (the stripboard), Call sheets (with issued revisions, Decision 0020), and the Calendar (Decision 0043). Components: Stripboard strip, Call sheet, Production calendar, Production timeline, Data table for the one-liner and day out of days, Element tag, Stat.

The screens

Screen What it does Components
Stripboard Scenes as strips, ordered into days Stripboard strip
Unscheduled tray Strips not yet on a day Stripboard strip
One-liner The schedule as a dense printable list Data table
Day out of days Each cast member’s working days by code Data table (dense)
Calendar The days on a calendar with prep, recces and deadlines Production calendar
Call sheet The day’s sheet, working draft and issued revisions Call sheet
Crew calls Department call times Data table, Time picker
Issue Freeze a revision; PDF and CSV Dialog, Toast

Live demo

A day on the stripboard, ending with its banner, and the day’s call sheet as issued.

Day4Thu 21 Nov · Lumen Studios3 scenes · 4 6/8 pages · cast 1, 2
12INTEdit suiteMira finds the frameN1 3/81
3INTLab corridorThe courier arrivesD5/812
14EXTStreet outside the labRain, the scooter leavesN2 6/82
End of Day 4 · 4 6/8 pages
Thea Experience

Blank Pages

DirectorMira RaoProducerDev M.1st ADSana K.
Crew call07:30Day 4 of 18Rev 3

Scenes

ScSet and descriptionD/NPagesCast
12Int. Edit suiteMira finds the frameN1 3/81
14Ext. Street outside the labRain, the scooter leavesN2 6/82
<section class="kw-day" aria-label="Day 4, Thursday 21 November">
  <div class="kw-day__head"><span class="kw-day__number"><small>Day</small><strong>4</strong></span><span class="kw-day__summary"><strong>Thu 21 Nov · Lumen Studios</strong><span>3 scenes · 4 6/8 pages · cast 1, 2</span></span><button class="kw-icon-button" type="button" aria-label="More actions for Day 4">⋯</button></div>
  <div class="kw-day__load" aria-hidden="true"><b style="width:68%"></b></div>
  <div class="kw-strips">
    <div class="kw-strip" data-tone="int-night"><button class="kw-strip__grip" type="button" aria-label="Move Scene 12">⋮</button><span class="kw-strip__number">12</span><span class="kw-strip__where">INT</span><span class="kw-strip__place"><strong>Edit suite</strong><small>Mira finds the frame</small></span><span class="kw-strip__when">N</span><span class="kw-strip__length">1 3/8</span><span class="kw-strip__cast"><i>1</i></span></div>
    <div class="kw-strip" data-tone="int-day"><button class="kw-strip__grip" type="button" aria-label="Move Scene 3">⋮</button><span class="kw-strip__number">3</span><span class="kw-strip__where">INT</span><span class="kw-strip__place"><strong>Lab corridor</strong><small>The courier arrives</small></span><span class="kw-strip__when">D</span><span class="kw-strip__length">5/8</span><span class="kw-strip__cast"><i>1</i><i>2</i></span></div>
    <div class="kw-strip" data-tone="ext-night"><button class="kw-strip__grip" type="button" aria-label="Move Scene 14">⋮</button><span class="kw-strip__number">14</span><span class="kw-strip__where">EXT</span><span class="kw-strip__place"><strong>Street outside the lab</strong><small>Rain, the scooter leaves</small></span><span class="kw-strip__when">N</span><span class="kw-strip__length">2 6/8</span><span class="kw-strip__cast"><i>2</i></span></div>
    <div class="kw-strip kw-strip--banner">End of Day 4 · 4 6/8 pages</div>
  </div>
</section>
<article class="kw-paper" aria-label="Call sheet, Day 4, revision 3">
  <div class="kw-cs-top"><div><span class="kw-cs-company">Thea Experience</span><h2>Blank Pages</h2><div class="kw-cs-people"><span class="kw-cs-slot"><span>Director</span><b>Mira Rao</b></span><span class="kw-cs-slot"><span>Producer</span><b>Dev M.</b></span><span class="kw-cs-slot"><span>1st AD</span><b>Sana K.</b></span></div></div><div class="kw-cs-call"><span>Crew call</span><strong>07:30</strong><em>Day 4 of 18</em><span class="kw-cs-stamp">Rev 3</span></div></div>
  <section class="kw-cs-block"><h3>Scenes</h3><table class="kw-cs-table"><thead><tr><th>Sc</th><th>Set and description</th><th>D/N</th><th>Pages</th><th>Cast</th></tr></thead><tbody><tr><td class="num">12</td><td><strong>Int. Edit suite</strong><small>Mira finds the frame</small></td><td>N</td><td class="num">1 3/8</td><td class="num">1</td></tr><tr><td class="num">14</td><td><strong>Ext. Street outside the lab</strong><small>Rain, the scooter leaves</small></td><td>N</td><td class="num">2 6/8</td><td class="num">2</td></tr></tbody></table></section>
</article>

Domain conventions

Page lengths in eighths

Scenes are measured in pages and eighths of a page, as printed in standard screenplay format: 5/8, 1 3/8, 2. One eighth is about an inch of the page. No scene is shorter than 1/8. Write lengths as whole pages and eighths, never as decimals (1 3/8, not 1.375), and add them the same way (4 6/8). Kwark’s formatEighths writes them exactly so.

Strips

  • A strip carries the scene number, INT or EXT, the set (as in the slugline), D or N, the length in eighths, and the cast ID numbers in the scene.
  • Paper colours follow a common convention: white for interior day, yellow for exterior day, blue for interior night, green for exterior night. Productions and software vary (some add colours for dawn, dusk or second unit); Kwark keeps these four and says so. Colours are read from the scene heading.
  • Day breaks end each shooting day with a banner (End of Day 4 · 4 6/8 pages). Off days, travel days and holidays are their own banners.

Cast ID numbers

Each speaking part gets a number, conventionally by billing or prominence, with the lead as 1. The same number appears on strips, the call sheet and the day out of days. Never renumber cast once the schedule has gone out.

Day out of days

A grid of cast (or other elements) against shooting days, with a code for each day. Common codes:

Code Means
SW Start work: first day
W Work
WF Work finish: last day
SWF Start, work and finish on the same day
H Hold: paid but not working
T Travel
R Rehearsal
F Fitting
Drop, pick up Released, then brought back later, where an agreement allows it. Software writes these codes differently

Codes and drop/pick-up rules depend on the union or agreement and on the scheduling software; let the production configure them and print a legend.

Call sheet

The day’s sheet carries, at least: production and company; the day (Day 4 of 18) and date; crew call, prominent; shooting call; breakfast and lunch times; sunrise and sunset; weather; scenes with set, D/N, pages and cast; cast with pick-up, make-up and wardrobe, and on-set times; locations with unit base, parking and directions; the nearest hospital; department notes; and an advance schedule for the next day. Personal phone numbers are scoped by role.

Turnaround and hours

Rest between wrap and the next call, meal breaks and maximum hours are set by law, union agreements or the production’s contracts, and vary by country. Never hard-code a number; let the production enter its rules and show the gap in words when a call breaks one (10 h since yesterday’s wrap).

Revisions

Issue numbered, frozen revisions per day (Decision 0020). The crew must be able to answer “which version did I get?”. Script page revisions use the colour sequence instead; see Script revision diff.

Keyboard map

Key Does
↑ / ↓ Previous / next strip
⌘ ↑ / ⌘ ↓ Move the strip up / down
⌘ ⇧ ↑ / ⌘ ⇧ ↓ Move the strip to the previous / next day
B Insert a day break after the selected strip
U Send the strip back to Unscheduled
Enter Open the scene
⌘ P Print the viewed call sheet revision
C, T, W, M, A, L Calendar: quick add, today, week, month, agenda, timeline (Decision 0043)

Dragging strips always has a keyboard and menu equivalent; announce the new position (Scene 12 moved to Day 5, position 2).

Phone and desktop

Desktop is where the AD builds the board: days in the middle, the unscheduled tray on the right, scene details in a drawer. The one-liner and day out of days print from here.

Phone is where the sheet is read:

  • The newest issued revision opens first for anyone who cannot edit (Decision 0020 review).
  • Crew call is the first thing on screen; then scenes, then my call if the person has one.
  • Strips collapse to number, place, length and cast; INT/EXT and D/N are carried by colour and the place.
  • The calendar defaults to Agenda on phones (Decision 0043).

AI and authorship

  • May propose a first-pass schedule grouped by location and cast, as a separate draft the AD can open, change or throw away. It is marked as proposed until the AD accepts it.
  • May find conflicts: a cast member’s hold days, a night exterior after a day call that breaks the production’s turnaround rule, a location booked on two days.
  • Never issue a call sheet, send it, or change an issued revision.
  • Never judge the AD’s schedule as efficient or inefficient; show the facts (pages per day, setups, company moves) and let them decide.

Proposed schedule, not yet yours in its own tab, with Use as working schedule.

Do

The board silently re-sorted overnight “for efficiency”.

Don’t

Accessibility notes for this craft

  • Strips carry INT/EXT and D/N in text; colour repeats it.
  • Days are sections named with day number and date.
  • Printed sheets use black ink and the paper colours only where they mean something.

Starter prompt

You are building a stripboard and call sheet app on the Kwark Design System. Read https://kwark.space/designSystem/kits/scheduling-and-call-sheets.md, /components/stripboard-strip.md, /components/call-sheet.md and /components/production-calendar.md. Measure scenes in pages and eighths, colour strips white, yellow, blue and green by INT/EXT and DAY/NIGHT read from the scene heading, and keep cast ID numbers stable. Issue call sheets as numbered, frozen revisions per day; keep the working draft editable and say whether it matches the latest revision. Print, PDF and CSV come from the same frozen copy. Use only --k-* tokens. Do not hard-code union rules; make them settings. Report anything the system does not define.

AI readiness test

Task. Move Scene 14 from Day 4 to Day 5 after Day 4’s call sheet was issued as Rev 3.

Give the agent. Scheduling and call sheets kit, Stripboard strip, Call sheet, Decision 0020.

Constraint. Some crew hold printed Rev 3.

A reliable answer

  • Strip moves by drag or keyboard and the move is announced
  • Day totals update in eighths
  • Day 4 working draft says Edited since Rev 3
  • Rev 3 stays viewable and unchanged
  • Nothing is sent automatically

Give this Markdown to your coding agent or share its URL.

Open .mdllms.txt
Loading…